Text Only • 
    Home  •  Bonds  •  Rapid Web Designer - Ver 4.0
Southwest ISD 2001 Bond Information
 
2001 - $27 Million Bond Passed
Replacement or additions at Southwest Elementary (Opened 2004), Sun Valley Elementary (Opened 2005), Sky Harbour Elementary (Opened 2006), Indian Creek Elementary (Opened 2005) and Technology Infrastructure updates throughout the district.
Bond Projects
Allowed computer placement in all campuses so that all segments of the districts will have equal access to computer learning.
Cost: $1.23 million
New Southwest Elementary opened in August 2004 for apes Pre-K4 through 5th grade. With room for 800 students, the approximately 82,000 square foot,  fully air-conditioned school features networked classrooms with secure keyless entry, computer labs, science labs, music and art rooms, gymnasium, library, staff reference room, security entry doors, large cafetorium, teacher workroom and nurse's room.
Cost: $8 million
New Sun Valley Elementary opened in August 2005 at the same locations for ages Kinder through 5th grade. With room for 800 students, the approximately 82,000 square foot, fully air-conditioned school features networked classrooms with secure keyless entry, computer labs, science labs, music and art rooms, gymnasium, library, staff reference room, security entry doors, large cafetorium, teacher workroom and nurse's room.
Cost: $9 million
OZAB Grant for reroofing, asbestos abatement and Heating, Ventilation and Air Conditioning upgrades at the High School, McAuliffe, McNair, Southwest Enrichment Center, Bob Hope, Hidden Cove, and Big Country completed in 2006.
Cost: $8 million
Indian Creek Elementary opened a new wing totaling approximately 9,000 square feet, in the fall of 2005. It included two science labs, computer lab, and four classrooms. A canopy separates the new parent drop-off and the bus loop route to lessen traffic congestion. Fenced playing fields and a new covered walkway to the gym ensures safety and definition for outdoor activities.
Cost: $1.5 million
Sky Harbour Elementary opened in the Fall of 2006 for ages Kinder through 5th grade, completely rebuilt except for foundation and outer walls. With a multilevel design and room for 800 students, the fully air-conditioned school features networked classrooms with secure keyless entry, computer labs, science labs, music and art rooms, gymnasium, library, staff reference room, security entry doors, large cafetorium, teacher workroom and nurse's room.
Cost: $9 million

swe.jpg
Southwest Elementary
sve.jpg
Sun Valley Elementary
ice.jpg
Indian Creek Elementary
she.jpg
Sky Harbour Elementary

 

11914 Dragon Lane, San Antonio, Texas 78252 Tel: (210) 622-4300
© Southwest ISD, 2016

Click Here for Our Communication/Privacy Statement